Welcome to DINGDANG INDUSTRY CO.,LIMITED!
Products
PP-R Low Clamp Pipe Fitting
  • PP-R Low Clamp Pipe Fitting
  • PP-R Low Clamp Pipe Fitting
  • PP-R Low Clamp Pipe Fitting
  • PP-R Low Clamp Pipe Fitting
  • PP-R Low Clamp Pipe Fitting
  • PP-R Low Clamp Pipe Fitting

PP-R Low Clamp Pipe Fitting

0.03~0.2 USD
Min. Order:
5 Pack/Packs
Trade Term:
FOB
Payment Terms:
L/C, T/T
Place of Origin:
Zhejiang, China (Mainland)
Means of Transport:
Ocean, Air, Land
Production Capacity:
300000pcs/month
Packing:
cartons
Delivery Date:
30 days
Head Code:
Others
Shape:
Equal
Technics:
Others
Type:
Nipple
Material:
Imported raw material PPR
Connection:
Others
Brand Name:
OEM
Working Medium:
Water
Working Pressure:
2.50MPa
Working Temperature:
95℃
Specifications:
Dn20~ Dn160
Process:
Injection
MOQ:
5 cartons
Delivery Time:
Within 30 days
Port of Loading:
Ningbo or Shanghai
Export Area:
All over th world

  • Product Description
  • Related Products
  • Related Links
  • PP-R Low Clamp Pipe Fitting 

    ***SPECIFICATIONS

    PP-R Low Clamp Pipe Fitting
    SizeNet WeightPCS/CTNMOQ(cartons)
    20mm5g30005
    25mm6g18005
    32mm8g15005
    40mm13g10005
    50mm15g6605
    63mm19g4505

    Green PPR Low Clamp Pipe Fittings in addition to general plastic tube with a light weight , corrosion , scaling , long life and other characteristics, but also has the following main features:

    1.Non-toxic , health . PPR raw molecules only carbon and hydrogen elements , no harmful toxic elements are present , reliable health, not only for the hot and cold water pipes , but also for pure drinking water systems .

    2.Thermal insulation . PPR pipe thermal conductivity 0.21w/mk, steel is only 1/200.

    3.Preferably heat resistance. Vicat softening point PPR pipe 131.5 ℃. The maximum operating temperature of up to 95 ℃, water supply and drainage construction to meet the requirements of the specification using hot water system .

    4.Long life . PPR pipe operating temperature 70 ℃, working pressure (PN) 1.OMPa conditions , the service life up to 50 years ; room temperature (20 ℃) life of up to 100 years.

    5.Easy to install , reliable connection . PPR has good weldability, pipes, fittings can be melt and fused connection , easy to install , reliable joints connecting parts is greater than the strength of the strength of the pipe itself .

    6.The material is recyclable . PPR waste cleaned , crushed and recycled in pipe, tube production . Recycled material 
    The amount does not exceed 10% of the total , does not affect product quality.

    **Use of Green PPR Coupling Pipe Fittings

    1, building hot and cold water systems, including central heating systems; 

    2, the building heating system, including flooring, siding and radiant heating systems; 

    3, can be directly purified drinking water supply systems; 

    4, Central (centralized) air-conditioning systems; 

    5, transfer or discharge of chemical mediators such as industrial piping systems.


    **FUSING TOOLS

    The pipes and fittings in Type three PP-RC piping systems are connected through thermal fuse plugging.The thermal fusing tools are applied to melt the inner & outer surfaces of the fitting and pipes simultaneously and plug connect them under the specified temperature and conditions.The two pats are integrated uniformly and firmly when cooled.The connection provides good sealing,high reliablity and avoids any leakgae.See the table for fusing connection technical requirement.

    ***OPERATION REQUIREMENT

    • Check whether or not the specifications of the pipes and fittings to be connected meet with the install action requirement before the construction.Special attention shall be paid not to misuse or mix up cold and hot water pipes;

    • Check the visual quality of pipes and fittings.Remove any cracks found,oil and burs.Strictly follow specified technical parameters for operation.The pipes or fittings shall be inserted directly instead of being rolated during heating;

    • There shall be a uniform fusing circle at the connection between pipes and fittings;

    • In case of lack of skill,a line shall be marked at pipe insert point to confirm the depth,the manual insertion depth shall be strictly controlled to avoid any over insertion that causes blockage and negative influence to flow rate.

    • The pipes can be sealed and used only after pressure test and acceptance.

    • ***Techinical Parameter for Fusing Connection:

      Pipe Outer Diamter

      (mm)

      Fusing Depth

      (mm)

      Heating Time

      (Second)

      Inserting Time

      (Second)

      Cooling Time

      (Second)

      2014542
      2515742
      3216.5864
      40181264
      50201864
      63242486
      752640108
      903240108
      11038.5501510
      16056802015

    ***FUSING CONNECTION PROCEDURE